Simulation detection system for cementing displacement efficiency

Key words:

Hydrate Experimental Equipment | Shale Gas CBM and Geothermal Equipment

Product Description

The displacement efficiency of cement injection during well cementing is a key indicator for measuring the coverage of annular space by cement slurry replacing drilling fluid, which directly determines the sealing performance of the cement sheath and the quality of interlayer sealing.

Main technical parameters

1. Pressure sensor range: 0-100MPa

2. Pressure accuracy: ± 0.1% FS

3. Flow meter range: 0.1-5 m ³/min, accuracy: ± 0.5%

4. Conductivity sensor: Range: 0-100 mS/cm, Resolution: 0.1 mS/cm


Product inquiry

Filling in your phone number and E-mail will help us to contact you in a timely manner and solve your problems as soon as possible.

UNIPAC TECHNOLOGY



Business License